Installing an Internal DLT80 Tape Drive
Preparing the Server
To prepare the server for installation:
1. Perform a normal system shutdown.
2. Turn OFF the server and all peripheral devices.
3. Disconnect the AC main power cord from the outlet, then from the server and
4. Disassemble the system to expose the drive bay. Refer to the user manual that
Preparing the Tape Drive
Choose the right and left front panel labels from the labels provided in the kit.
Place them over the existing front panel.
Figure 6: Adhering the front labels
24
Caution:
Electrostatic discharge (ESD) can damage electronic components. Be
sure you are properly grounded before beginning this procedure. See
Appendix B, "Electrostatic Discharge" for further information.
from all peripheral devices.
came with your server.
DLT
DLT80 Tape Drive Reference Guide