Replace Ice Bank Water: Every 12 Months - Zenith HydroChill HCF90NZ Installation Instructions & User Manual

Table of Contents

Advertisement

28
805812NZ v1.04 05.20 HydroChill Install Instructions
Maintenance

Replace ice bank water: every 12 months

CAUTION Do not put your hands inside the tank if the machine is
!
running.
Empty the tank if the machine is to be left unused for a long time.
1. Disconnect power and water.
2. Remove the upper cover.
3. If ice has formed, allow 12 hours for the ice to melt.
4. Refer to the drainage system (A).
5. Loosen the fixing screw (B).
6. Hold the upper end of the tube (C) firmly to prevent spillage,
then remove the plastic clip (D) from its seat, sliding it along the
rubber tube.
7. Firmly hold the tube upstream from the clip to avoid any water
seeping out, then remove the plastic clip from the tube (E).

Advertisement

Table of Contents
loading

Table of Contents