Zenith HydroChill HCF90NZ Installation Instructions & User Manual page 21

Table of Contents

Advertisement

Bottle pressure gauge
Indicates when bottle is empty.
Initial pressure is 35-40 bar.
Regulator knob
- adjust
Adjustable
pressure gauge
Adjust to 4-6 bar.
Test joints for
leaks
Installation instructions
Connect CO
Measure and trim the black hose to connect to the gas inlet at the
front of the chiller, marked "IN CO
required for routing.
Install a stop valve in the black hose, in an accessible location,
(recommended 100 mm from the chiller inlet).
Adjust gas supply
With the CO
operating the sparkling tap for a few seconds.
Slowly open the CO
clockwise, until it is fully open.
Adjust the regulator knob until the gauge shows between 400-
600 kPa (4-6 bar, or 58-87 psi), depending on the degree of
carbonation required.
Optimal carbonation
Ensure the inlet water pressure is below 300kPa (3 bar/45 psi)
To improve carbonation, set a lower temperature on the chiller
machine.
Cylinder
Test for gas leaks
valve - ON
IMPORTANT: After replacing a gas cylinder or after making a gas
connection, test for gas leaks.
Use soapy water to perform a leak test. Turn OFF the gas at the
cylinder and turn OFF the stop valve near the chiller. Apply a liberal
amount of soapy water suds to the gas connections using a sponge or
brush.
Slowly turn ON the gas at the cylinder. Inspect for leaks between
the regulator and cylinder, and between the regulator and hose.. If
bubbles appear and grow, there is a gas leak at the connection. Clean
away the soapy residue and ensure the gas is turned off, then tighten/
refit the leaking connections.
Allow approximately 1 hour after installation for the water to reach
optimum chilled temperature and carbonation level.
hose to chiller
2
2
cylinder closed, remove the air in the circuit by
2
cylinder valve by turning the knob anti-
2
805812NZ v1.04 05.20 HydroChill Install Instructions
". Use straight and elbow fittings if
21

Advertisement

Table of Contents
loading

Table of Contents