Before Installation - Zenith HydroChill HCF90NZ Installation Instructions & User Manual

Table of Contents

Advertisement

A. Read the instructions. Note: All fittings are supplied with the appliance kit.
B. A user easily-accessible 220-240V AC, 10A power outlet is required. The appliance must be connected in
accordance with current local electrical regulations. See Technical specification and the appliance rating
plate for power ratings. Check cable and plumbing against inlet/outlet positions before proceeding.
C. Ensure a potable water supply connection with working pressure of 250 - 700 kPa (2.5 - 7.0 bar), with
isolating valve within reach of the hoses, and positioned so that the connection point and the stop cock
will not be obstructed when the under-counter chiller is installed.
D. A 350 kPa (3.5 bar) pressure limiting valve (supplied) must be fitted.
E. All plumbing must comply with the relevant parts of AS/NZS 3500.
F. All electrical must comply with AS/NZS 3000 wiring rules.
G. Check the underbench cupboard supporting the appliance is adequate for the total weight of the
appliance.
H. The appliance must operate within ambient temperatures of 5°C - 32°C.
I. Frost protection: if the appliance is located where ambient air temperature could fall below 5°C, do not
turn off electrically. This safeguard does not offer the same protection to the connecting pipework and
fittings.
J. The appliance must be placed upright with its base in a horizontal position.
!
IMPORTANT! Do not proceed with the installation if these requirements are not met.
14
805812NZ v1.04 05.20 HydroChill Install Instructions

Before installation

Advertisement

Table of Contents
loading

Table of Contents