Preparation

6.4.5 To check the water volume: Examples

6.5 Preparing electrical wiring

6.5.1 About preparing electrical wiring

Installer reference guide
50
The default pre-pressure of the expansion vessel is 1  bar. When it is required to
change the pre-pressure, take following guidelines into account:
Only use dry nitrogen to set the expansion vessel pre-pressure.
Inappropriate setting of the expansion vessel pre-pressure will lead to
malfunction of the system.
Changing the pre-pressure of the expansion vessel should be done by releasing or
increasing nitrogen pressure through the Schrader valve of the expansion vessel.
a
Schrader valve
Example 1
The indoor unit is installed 5  m below the highest point in the water circuit. The
total water volume in the water circuit is 100 l.
No actions or adjustments are required.
Example 2
The indoor unit is installed at the highest point in the water circuit. The total water
volume in the water circuit is 250 l.
Actions:
Because the total water volume (250  l) is more than the default water volume
(200 l), the pre-pressure must be decreased.
The required pre-pressure is:
Pg = (0.3+(H/10)) bar = (0.3+(0/10)) bar = 0.3 bar
The corresponding maximum water volume at 0.3 bar is 290 l. (See the graph in
"Maximum water
volume" [
Because 250  l is lower than 290  l, the expansion vessel is appropriate for the
installation.
INFORMATION
Also read the precautions and requirements in the "General safety precautions"
chapter.
4
 48]).
ERGA04~08DAV3(A) + EHVZ04+08S18+23DA6V+9W7
a
Daikin Altherma 3 R F
4P618957-1 – 2020.03

Advertisement

Table of Contents
loading

Table of Contents