Riello Gulliver BG7D Installation, Use And Maintenance Instructions page 68

Light oil burner two stage operation
Table of Contents

Advertisement

Available languages

Available languages

3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1
WORKING POSITION
The burner is designed for operation in positions 1 and 2 only.
Installation 1 is the preferred option as it is the only one that enables maintenance to be performed as described
later on in this manual.
Operation is possible with installation option 2 though maintenance cannot be performed with the burner
connected to the boiler. Note that any other installation position is likely to hinder the unit's proper operation.
Installations 3, 4 and 5 are prohibited as safety is compromised.
1
3.2
BOILER FIXING
To fit the burner to the boiler it is necessary to carry out the following:
Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4, fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4), (see fig. 2).
Open the boiler door, insert the flame tube (6) on the burner blast tube (7) and fix it with the nut (8).
ATTENTION: Boiler door must have a max. thickness of 180 mm, refractory linig included.
After installation ensure that burner is lightly inclined, (see fig. 5).
Fig. 4
Fig. 4
4
D5012
D5012
Fig. 5
D5025
3066
2
3
6
2
1
5
4
8
3
7
Fig. 3
GB
5
D7088
Fig. 2
4
1
5
S7158

Advertisement

Table of Contents
loading

Table of Contents