Kaba Saflok MT RFID Installation Instructions Manual page 6

Table of Contents

Advertisement

MT
RFID Installation Instructions
TM
Installing the lock trim
13. Secure the inside trim cover to the inside trim using two M4 x 16mm Torx screws (see Fig. 5).
14. Program the lock using the Lock Programmer and Interrogator (LPI) probe (p# 72400) with the Hand Held Terminal.
*The programming port is located in the bottom of the outside lock trim.
Test the functioning of the lock as discussed in the following section and in the programming manual before closing
the door. When the construction key is used, the green and red LEDs will blink together, indicating that the lock's
time and date are not set.
15. For locks installed in exterior applications. After programming, inject dielectric grease into the programming
port to prevent moisture from damaging the electronics.
© SAFLOK, all rights reserved.
(continued)
Fig. 5
M4 x 16mm
Torx
Pg 6 of 8
INS_MTRFID_2_12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents