ABB Relion 650 Series Commissioning Manual page 8

Busbar protection version 1.1 iec
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Table of contents
Section 5
communication............................................................................................. 29
5.1
Setting the station communication....................................................................................... 29
5.2
Verifying the communication...................................................................................................29
Section 6
Testing IED operation.................................................................................. 31
6.1
Preparing the IED to verify settings........................................................................................31
6.2
Activating test mode................................................................................................................. 32
6.3
Preparing the connection to the test equipment................................................................ 33
6.4
Connecting test equipment to the IED.................................................................................. 33
6.5
Releasing the function to be tested....................................................................................... 34
6.6
Verifying analog primary and secondary measurement.................................................... 35
6.7
Testing protection functionality............................................................................................. 36
Section 7
Testing functionality....................................................................................37
7.1
Testing disturbance report...................................................................................................... 37
7.1.1
Introduction...............................................................................................................................37
7.1.2
Disturbance report settings...................................................................................................37
7.2
7.3
Testing differential protection functions..............................................................................37
7.3.1
High impedance differential protection HZPDIF .............................................................. 37
7.3.1.1
7.3.1.2
7.4
Testing current protection functions.................................................................................... 38
7.4.1
Four step phase overcurrent protection OC4PTOC..........................................................38
7.4.1.1
7.4.1.2
7.4.2
Four step residual overcurrent protection EF4PTOC ...................................................... 39
7.4.2.1
7.4.2.2
7.4.2.3
7.4.3
Thermal overload protection, two time constants TRPTTR ...........................................40
7.4.3.1
7.4.3.2
7.4.4
Breaker failure protection CCRBRF...................................................................................... 42
7.4.4.1
7.4.4.2
7.4.4.3
7.4.4.4
7.4.4.5
7.4.4.6
7.4.4.7
7.4.4.8
7.4.5
Pole discordance protection CCRPLD..................................................................................45
7.4.5.1
7.4.5.2
2
Verifying the settings.........................................................................................................37
Completing the test........................................................................................................... 38
Verifying the settings........................................................................................................ 38
Completing the test........................................................................................................... 39
Four step directional residual overcurrent protection .............................................. 40
Four step non-directional residual overcurrent protection.......................................40
Completing the test...........................................................................................................40
Checking operate and reset values................................................................................. 41
Completing the test........................................................................................................... 41
Checking the re-trip and back-up times........................................................................ 42
Verifying the re-trip mode................................................................................................ 43
Verifying the back-up trip mode......................................................................................43
RetripMode = Contact ..................................................................... 44
Completing the test........................................................................................................... 45
Verifying the settings........................................................................................................ 45
Completing the test........................................................................................................... 45
© Copyright 2011 ABB. All rights reserved
Busbar protection REB650
Commissioning manual