1.
Check that
2.
Initiate a three-phase fault.
The functional output TRIP should be active at each fault. The output CLLKOUT must not
be set.
3.
Activate the automatic lockout function, set
Beside the TRIP outputs, CLLKOUT should be set.
4.
Reset the lockout signal by shortly thereafter activating the reset lockout (RSTLKOUT)
signal.
5.
Activate the TRIP signal lockout function, set
The output TRIP must be active and stay active after each fault, CLLKOUT must be set.
6.
Repeat. Reset the lockout.
All functional outputs should reset.
7.
Deactivate the TRIP signal lockout function, set
lockout function, set
7.7.1.3

Completing the test

Continue to test another function or end the testing by setting the parameter
under Main menu/Tests/IED test mode/1:TESTMODE. If another function is tested, then set
the parameter
SMPPTRC(94,1->0)/X:SMPPTRC for the function, or for each individual function in a chain, to
be tested next. Remember to set the parameter
that has been tested.
7.8

Testing monitoring functions

7.8.1

Event counter CNTGGIO

The event counter function CNTGGIO can be tested by connecting a binary input to the counter
under test and from outside apply pulses to the counter. The speed of pulses must not exceed
10 per second. Normally the counter will be tested in connection with tests on the function
that the counter is connected to, such as trip logic. When configured, test it together with the
function that operates it. Trig the function and check that the counter result is the same the
number of operations.
7.9

Testing metering functions

7.9.1

Pulse counter PCGGIO

The test of the Pulse counter function PCGGIO requires the Parameter Setting tool in PCM600
or an appropriate connection to the local HMI with the necessary functionality. A known
number of pulses with different frequencies are connected to the pulse counter input. The test
should be performed with settings
blocked or unblocked. The pulse counter value is then checked in PCM600 or on the local HMI.
7.10

Exit test mode

The following procedure is used to return to normal operation.
1.
Navigate to the test mode folder.
2.
Change the
3.
Answer
Busbar protection REB650
Commissioning manual
AutoLock and TripLockout are both set to Off .
AutoLock = Off if not needed.
Blocked to No under Main menu/Tests/Function test modes/Logic/
Operation = On or Operation = Off and the function
On setting to Off . Press the 'E' key and the left arrow key.
YES , press the 'E' key and exit the menus.
© Copyright 2011 ABB. All rights reserved
AutoLock = On and repeat
TripLockout = On and repeat.
TripLockout = Off and the automatic
Blocked to Yes , for each individual function
Section 7
Testing functionality
SEMOD54375-203 v5
TestMode to Off
M13419-2 v3
M13405-2 v5
SEMOD53244-3 v3
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reb650

Table of Contents