Installation Procedures; Figure 3-1: Location Of Ifau-16* Mms Pcb Installation (1000Kva) - Toshiba G9000 Series Installation Manual

Mms kit 480/480 v 1000/1330/1500/1660/2000kva
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

4

Installation Procedures

Ground bus
Front View of bypass cabinet (with door open)
6
Step5A
Details
Ferrite core
Screw(M3)
Step 1: Screw 8 spacers on the metallic plate (shown in red).
Step 2: Secure the parallel interface board IFAU-16* on the spacers
(Front cover)
Step 3: Secure the ferrite core with an M3 screw (shown in pink).
Step 4: Cover the modular connectors with the dust cover.
Step 5A: Check location of Ground bus for the next step.
Figure 4-1: Location of IFAU-16* MMS PCB Installation (1000kVA)
(Upper right of bypass cabinet
for 1000kVA UPS)
Spacer x8
Step1
IFAU-16*
Step2
Screw(M3) x8
Step3
Details of A
with M3 screws.
G9000 MMS KIT Installation Manual 1000-2000kVA – 200150-001
Unit: mm
Dust cover x12
Step4
(Front cover)