Figure 3-2: Location Of Ifau-16* Mms Pcb Installation (1330-2000Kva) - Toshiba G9000 Series Installation Manual

Mms kit 480/480 v 1000/1330/1500/1660/2000kva
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

Details
Step5A
Front View of bypass cabinet (with door open)
G9000 MMS KIT Installation Manual 1000-2000kVA – 200150-001
Ground bus
Ferrite core
Screw(M3)
Step 1:
Step 2:
Step 3:
Step 4:
Step 5A: Check location of Ground bus for the next step.
Figure 4-2: Location of IFAU-16* MMS PCB Installation (1330-2000kVA)
(Upper right of bypass cabinet
for 1330-2000kVA UPS)
Spacer x8
Step1
Step2
IFAU-16*
Step3
Screw(M3) x8
Details of A
Screw 8 spacers on the metallic plate (shown in red).
Secure the parallel interface board IFAU-16* on the spacers
with M3 screws.
Secure the ferrite core with an M3 screw (shown in pink).
Cover the modular connectors with the dust cover.
Unit: mm
Dust cover x12
Step4
7

Advertisement

Table of Contents
loading

Table of Contents