Download Print this page

Installation Instructions - Advantech SKY-642 4U Startup Manual

Server–grade ipc / computer

Advertisement

System Setup/系统安装/系統安裝

Installation Instructions

Stag Beatle tool-less server slide, 180 pounds (80kg).
Four Steps To Successful Installation
A. Please note that the 180lb-grade SB tool-less bracket is
designed and built for 2U chassis or above. Not recom-
mended for 1U applications.
B. The SB bracket is for an EIA rail with hole pitch as shown
in fig-1 and square holes, and can only be mounted behind
the rail. You will need to purchase a transfer bracket in
order to mount the SB bracket on the rail using the round
holes. The standard retail packaging includes one left hand
piece, one right hand piece, 4 x H-370 screws for ear plate
fastening and 2 x H-315 screws for chassis fastening.
* The 180lb-grade SB tool-less is not designed to be screw
mounted.You must mount the slides with a bayonet pre-
formed on the chassis.
After installation is finished, you may secure the server by
fixing the bracket with screws.
Step 1. Remove the chassis (inner) member
Pull the slide open. Then press the trigger down as shown
on the drawing, and pull the chassis (inner) member out.
**Extendable front bracket only applies to some tool-less
models
8 SKY- 642 Startup Manual /SKY-642快速入门手册/SKY-642快速入門手冊
MIN=725 0±3
MAX=985 0±3
EXT=260MM
Step 2. Mount the chassis (inner) member to the chassis
Please secure the screws on both sides and push back
the inner member to allow the rail slide to be fixed to the
rackmount chassis.
*The bayonet on chassis is pre-formed as per the recom-
mended dimensions and location.
Step 3 Attach the cabinet (outer) member to the rail
Insert the stag into the upper and lower square holes on
ELA rail from the back of the rail.
Push the safety lock forward to secure the bracket. It is im-
portant to check if the safety lock is in the unlocked position
before mounting the brackets.
Step 4 Mount the chassis into the cabinet
Insert the chassis (inner) member into the cabinet member
as shown on the drawing. It is important to check if the ball
retainer is in fully open position before install in the chassis.
It might cause damage to the chassis if the ball retainer is
not in fully open position while mounting the chassis. While
you are pushing the chassis back into the cabinet, you need
to release the slide from the locking position by pressing the
trigger down.
* VERY IMPORTANT – IT REQUIRES AT LEAST 2
PEOPLE TO INSTALL THE G11223540 CHASSIS FOR
SAFETY PURPOSES.

Advertisement

loading