RIB Duke 110 Manual page 20

Irreversible operator for leaf gates
Hide thumbs Also See for Duke 110:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 19
G
B
INsTALLATION DUKE
P
rE-INsTALLATION CHECKs
The leaf must be fixed firmily on the hinges to the pillars, must not be
flexible during the movement and must move without frictions.
before the installation of DUKE, verify all dimensions etc.
There's no need for any modification, if the gate is like that shown
in Fig. 1.
Gate features must be uniformed with the standards and laws in
force. The gate can be automated only if it is in a good condition and
its conditions comply with the EN 12604 norm.
- The gate leaf does not have to have a pedestrian opening. in the
opposite case it is necessary to take the appropriate steps, in
accordance with EN 12453 norm (for instance; by preventing the
operation of the motor when the pedestrian opening is opened, by
installing a safety microswitch connected with the control panel).
- No mechanical stop shall be on top of the gate, since mechanical
stops are not safe enough.
P
rEPArE THE CEMENTATION Of THE BOX
- Excavate a trench next to the pillar (Fig. 3).
- On the bottom of foundation box a 50 mm Ø pipe should be fitted to
drain water. On one side of the box another pipe 32 mm Ø should
be fitted. Pipe should be flexible, sturdy and insulated type, to let out
electrical wiring (use holes on internal side of gate opening).
ENsUrE THAT THE CABLE JOINTs ArE MADE inside a sealed
junction box OUTsIDE THE DUKE BOX (The junction box can be
built-in to the wall or surface mounted, positioned at a safe height and
must comply with the relevant standards).
- Use a level to position the box so that the upper edge of the cover
corresponds with the finished floor level.
- The centreline of the pintles must be perfectly in line with the centreline
of the operating arm mounting shaft.
- DUKE 110°: Cement in, taking care to ensure that cement does
not fall into the box and checking that the short sides of the box
are perfectly parallel to the gate when in the "CLOsED" position.
- DUKE 180°: Cement in, taking care to ensure that cement does
not fall into the box and checking that the short sides of the box
are perfectly perpendicular to the gate when in the "CLOsED"
position.
- insert the bolts for cover fixing in places cut into the foundation box.
I
NsTALLING THE DUKE 110°
- Make sure that the pivot of foundation box is well greased. lay down
the ball (CVA1479) end insert drive rod CME5224 after fitting release
system (picture 7).
- Fit gate bracket plate CME6987 through its pivot in the drive rod
(picture 8).
- Place gate leaf between upper hinge and plate of gate bracket (hinge
and pivot of gate bracket plate should be perfectly aligned).
- Weld carefully bracket plate on the leaf.
- Fit adjusting open position bolt A (picture 11) M10X30 and relevant
nut.
- Fit Duke operator inside the foundation box (picture 4).
- Screw on pulling lever adjusting bolt M10x60 and relevant nut (picture
11).
- Fit joint lever CCA1360 (picture
4).
- ATTENTION:
joint
CCA1360 must be fitted as
shown in picture 4. Should it
be difficoult to fit, operate
electrically the reducer.
CCA1360
lever
Parts to install meeting the EN 12453 standard
COMMAND TYPE
(out of public area*)
with manned operation
with visible impulses
(e.g. sensor)
with not visible impulses
(e.g. remote controldevice)
automatic
* a typical example are those shutters which do not have access to any public way
A: Command button with manned operation (that is, operating as long as activated),
like code ACG2013
B: Key selector with manned operation, like code ACG1010
C: Adjustable power of the motor
D: Safety strips and/or other safety devices to keep thrust force within the limits of
EN12453 regulation - Appendix A.
E: Photocells, like code ACG8026 (To apply every 60÷70cm for all the height of the
column of the gate up to a maximum of 2,5m - EN 12445 point 7.3.2.1)
sX
20
20
USE OF THE SHUTTER
Skilled persons
Skilled persons
(public area)
A
B
C or E
C or E
C or E
C and D, or E
C and D, or E
C and D, or E
CCA1360
DX
Unrestricted use
non possibile
C and D, or E
C and D, or E
C and D, or E
3
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Duke 180Aa10975Aa10985

Table of Contents