Cisco 8800 Series Hardware Installation Manual page 44

Hide thumbs Also See for 8800 Series:
Table of Contents

Advertisement

Install Cable Management and Door Kit on a Chassis
4 screws for 8808 chassis). Tighten each screw to 11.5 to 15 in-lb (1.3 to 1.7Nm) of torque. The number of
screws may vary based on the chassis.
Note
Step 3
Repeat Steps 2 and 3 to attach the other cable management bracket to the vertical mounting bracket on the
opposite side of the chassis.
Step 4
Position the bottom cover, with its brackets pointing up, to the bottom of the two side cable management
bracket screw holes.
Figure 23: Bottom Cover for 8818 Chassis
Hardware Installation Guide for Cisco 8800 Series Routers
38
Do not tighten the screws to its full torque value until the cable management brackets, bottom cover,
and top hood are installed.
Unpack and Install the Chassis

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

881288088818

Table of Contents