Section 2 - Setting Up The Equipment; Unpacking - VKI Technologies Eccellenza momentum Operation Manual

Hide thumbs Also See for Eccellenza momentum:
Table of Contents

Advertisement

Setting up the Equipment

Unpacking

Prior to signing for the delivery, check the shipping carton for damage.
Indicate any damage on the delivery slip and have the delivery driver sign to
acknowledge the damage. Damages during shipping must be claimed with
the carrier, and not with VKI Technologies.
1. Cut the straps on the outside of the box (A).
2. Lift the top carton (B).
3. Remove the two side foam supports and remove the cup stand assembly secured
between them (C).
VKI Publication #202377-001
Eccellenza Momentum
S
E C T I O N
2
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents