Information About Cautions and Warnings

1
Information About Cautions and Warnings
This manual may contain cautions and warnings.
This is an example of a CAUTION statement.
A CAUTION statement describes a situation that could potentially damage this
EVM board, your software, or equipment.
This is an example of a WARNING statement.
A WARNING statement describes a situation that could potentially cause HARM
to you.
The information in a caution or a warning is provided for your protection. Read each caution and warning
carefully.
2

Related Documentation from Texas Instruments

To obtain a copy of any of the following TI documents, call the Texas Instruments Literature Response
Center at (800) 477-8924 or the Product Information Center (PIC) at (972) 644-5580. When ordering,
identify this manual by its title and literature number. Updated documents can also be obtained through
the TI Web site at http://www.ti.com.
Data Sheets:
DAC7741
REF102
OPA627
OPA2277
SN74ALVC16245
3

Questions about this or other Data Converter EVM's?

If you have questions about this or other Texas Instruments Data Converter evaluation modules, contact
the Data Converter Application Team by e-mail at dataconvapps@list.ti.com. Include the product you have
questions or concerns with in the subject heading .
4

FCC Warnings

This equipment is intended for use in a laboratory test environment only. It generates, uses, and can
radiate radio frequency energy and has not been tested for compliance with the limits of computing
devices pursuant to subpart J of part 15 of FCC rules. Operation of this equipment in other environments
may cause interference with radio communications, in which case the user at his expense will be required
to take whatever measures may be required to correct this interference.

Trademarks

TMS320 is a trademark of Texas Instruments.
2
DAC7741EVM
CAUTION
WARNING
Literature Number:
SBAS248
SBVS022
SBOS165
SBOS079
SCAS419
Data Sheets:
Literature Number:
SN74AHC541
SCLS261
SN74AHC138
SCLS258
SN74AHC1G04
SCLS318
SN74AHC1G08
SCLS314
SN74AUP1G57
SCES503
SLAU093A – October 2002 – Revised May 2005
www.ti.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC7741EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents