Commissioning

6
Commissioning
6.1

General wiring guidelines

The wiring is defined in the circuit diagram of the PNOZmulti Configurator.
Please note:
Information given in the
}
Use copper wire that can withstand 75° C.
}
The power supply must meet the regulations for extra low voltages with protective sep-
}
aration.
Always connect the mounting rail to the protective earth via an earthing terminal. This
}
will be used to dissipate hazardous voltages in the case of a fault.
6.2

Connecting the supply voltage

Connect the supply voltage to the base unit:
Terminal 24 V and A1 (+): + 24 VDC
}
Terminal 0 V and A2 (-): 0 V
}
6.3

DeviceNet interface

It is possible to define which outputs on the control system will communicate with Devi-
ceNet. The connection to DeviceNet is made via a 5-pin screw connector.
1
V-
Termination DeviceNet
To minimise cable reflection and to guarantee a defined rest signal on the transmission line,
DeviceNetmust be terminated at both ends.
Operating Manual PNOZ mc4p
21054-EN-05
Technical details [
CAUTION!
Only connect and disconnect the expansion module when the supply
voltage is switched off.
NOTICE
Be sure to observe the requirements of the DeviceNet specification, volume
I, release 2.0 during installation.
2
3
4
5
CL
SD
CH
V+
19]
must be followed.
1:
V-
2:
CL
SD
3:
CH
4:
V+
5:
V-
CL (CAN_L)
Cable screening
CH (CAN_H)
V+
15