Storwize V5000 Gen2 5U Expansion Enclosure Parts - IBM Storwize V5000 Gen2 Quick Installation Manual

Hide thumbs Also See for Storwize V5000 Gen2:
Table of Contents

Advertisement

Table 24. Expansion canister and SAS port LEDs
Name
1
Canister fault
2
Canister status
3
Canister power
4
and
6
SAS link fault
5
and
7
SAS link
operational

Storwize V5000 Gen2 5U expansion enclosure parts

In the 5U expansion enclosure, all replaceable parts are customer-replaceable units (CRUs).
Note: All of the information that is listed in the following tables for the 2077-92F expansion enclosure is
also applicable to the 2078-92F expansion enclosure.
Color
Amber
Green
Green
Amber
Green
State
Off
On
Flashing
Off
On
Flashing
Off
On
Off
On
Off
On
Chapter 2. Installing the system hardware 117
Meaning
Normal operation.
A fault was detected.
The expansion
canister is being
identified. A fault
might or might not be
detected.
Canister is off.
Normal operation.
A vital product data
(VPD) error occurred.
Canister is off.
Canister is receiving
power.
No faults are
detected. All four phys
have a link
connection.
Several error
conditions are
possible:
• Only 1, 2, or 3 phys
are connected, but
not all 4.
• The phys are not
operating at the
same speed.
• All phys are not
connected to the
same remote port.
One or more of the
connected lanes are
attached to a
different address.
No link connection on
any lane. The
connection is down.
The SAS link is active.
At least one of the four
lanes is connected.

Advertisement

Table of Contents
loading

Table of Contents