Hardware Configuration - Huawei eSight V200R003C00 Hardware Installation Manual

Table of Contents

Advertisement

Hardware Configuration

Standard layout of the cabinet when IBM X3650M4 is installed
1
Power Distribution Box (3U)
Nonstandard Filler panel (1U)
Nonstandard Filler panel (1U)
Nonstandard Filler panel (1U)
Nonstandard Filler panel (1U )
Nonstandard Filler panel (1U)
Nonstandard Filler panel (1U)
Nonstandard Filler panel (1U )
Nonstandard Filler panel (1U )
Nonstandard Filler panel (1U )
Nonstandard Filler panel (1U )
Nonstandard Filler panel (1U )
LAN Switch - 2 (1U )
Cabling trough (1U )
LAN Switch - 1 (1U )
Cabling trough (1U )
Filler panel (4U )
Cabling trough (1U )
Filler panel (4U )
Cabling trough (1U )
Filler panel (2U )
Filler panel (2U)
KVM Switch (1U )
KVM (1U )
Filler panel (2U )
Filler panel (2U )
X3650 M4 - 4 (2U )
X3650 M4 - 3 (2U )
X3650 M4 - 2 (2U )
X3650 M4 - 1 (2U )
4
The cabinet configuration has
passed the strict verification,
and can meet the
requirements for the power
consumption and heat
dissipation. Install the X3650
M4 server by strictly complying
with the left installation
flowchart.

Advertisement

Table of Contents
loading

Table of Contents