Guide to Installing the Power Cables (When X3850 X5 Is installed)
Grounding strip
Cable No.
1,2,3,4,5,6,13,14
11
18,19
APD
B
output
input
19 10 5 31 11 18 9
15 13
LANS-1
19
LANS-0
18
13
X3850 X5 -3
KVM Switch
12
11
5
X3850 X5 -2
3
X3850 X5 -1
X3850 X5 -0
1
Description
Power cables of the X3850 X5 server
The server has two or more power
modules which are used to provide
power supply protection.
Power cables of the KVM
Power cables of the LAN Switch
A
output
input
W1
14 12 6 4 2
14
KVM
6
4
2
Grounding strip
The Label No. refers to the number
printed on the cable label.
The Cable No. refers to each cable
number in the diagram.
The remaining cables that need not to be
installed are bound in the applicable
position of the cabinet and is delivered as
the accessories.
12

Advertisement

Table of Contents
loading

Table of Contents