Huawei eSight V200R003C00 Hardware Installation Manual page 19

Table of Contents

Advertisement

2
Introduction to signal cables
Network cable
Fiber
3
Introduction to cable labels
Connection relationships of the signal cables are marked after the commissioning of the device. Labels are
attached at both ends of a cable and the ports of the server.
Serial cable (RJ-45 to DB-9)
KVM controlling conversion cables
18

Advertisement

Table of Contents
loading

Table of Contents