Installing external power cables
a
Install the power cables according to the upward cabling.
Ensure that the switches of the power distribution box and power distribution
cabinet are turned off before connecting the external power cables to the cabinet.
•The APD32-6-24 AC PDB, installed with a three-pin
connector at the input terminal block on the back,
provides dual AC inputs. The terminal on each side
supports the 220 V AC input. The maximum current of
each power input is 32 A.
•The silkscreen on the top of the PDB describes the
output current of the air breaker of group A/B.
•The preceding figure shows the dual input terminals
of the APD32-6-24 AC PDB. The four three-pin
connectors are connected to the following posts
respectively:
L1, L2, and L3 on the left side
the left side
L1, L2, and L3 on the right side
the right side
13
N1, N2, and N3 on
N1, N2, and N3 on