Preparation For Installation - Huawei eSight V200R003C00 Hardware Installation Manual

Table of Contents

Advertisement

Preparation for Installation

1
Notice
This document describes how to install the hardware components, how to connect the power cables and signal
cables, and how to check the connections when the IBM X3650M4, and IBM X3850X5 server act as the server
of eSight.
The cabinet configuration, power cable connection, and signal cable connection that are detailed in this
document are written according to the standard configuration. If the actual on-site installation requirements are
inconsistent with this document, handle the requirements according to the actual situation. Unless otherwise
specified, the slide rails installed in the cabinet are used for the corresponding devices. The models of the
corresponding floating nuts and panel screws are M6.
2
Document Preparation
The following document must be prepared before the installation:
N610E Cabinet Installation Guide (V2.0)
This document is delivered with the cabinet.
2

Advertisement

Table of Contents
loading

Table of Contents