Step Operation; Step Deployment - Lippert Components SOLIDSTEP 2.0 Master Owner's Manual

Steps
Table of Contents

Advertisement

Step Operation

Step Deployment

1.
Align the step latches at the top of the Victory Step with the installed footman loops (Fig. 1), then
lower until both step latches click into place around the footman loops.
2.
Lower the Victory Step to the ground.
1.
Remove and retain the
adjustment plate (Fig. 2B) and both rails of the Victory Step. Repeat for the other side.
NOTE: After the quick release lockpins are both removed, the lower support tubes will drop down, causing
the angle of the step treads to change.
2.
Grasp the back of any of the step treads and lift until the treads are all level with the ground. Continue
holding the steps level and replace one of the quick release lockpins into the nearest adjustment hole.
This will lock the step treads at the specified angle. Install the remaining quick release lockpin in the
identical hole in the other adjustment plate.
Rev: 11.08.19
5/16"
quick release lockpin (Fig. 2A) that extends through the bottom hole in the
Page 13
Fig. 1
Fig. 2
A
B
CCD-0001573-11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SOLIDSTEP 2.0 and is the answer not in the manual?

This manual is also suitable for:

Solidstep 3.0Victory step

Table of Contents