12 ft 6 in wide x 27 ft deep x 6 ft 2 in side height / 8 ft 2 in center height (8 pages)
Summary of Contents for KING CANOPY StorGuardII SG1324S-GV
Page 1
7.3 m (24 ft.) Length x 2 m (6 ft. 7 in.) Side Height / 2.6 m (8 ft. 9 in.) in Center / 2.08 m (6 ft. 10 in.) Door Height King Canopy Item # SG1324S-GV With 10 Legs, Cover with Side Walls, 2 End Walls, Rafter Cables, Elastic Ball Straps, Foot Pads and Anchors.
PARTS LIST 3X4-2GV-A 30 pc 2”x39.5” Swage Pipe 2X0-2GV-B 10 pc 2”x23.75” Swage Pipe 2X9GV-C 20 pc 1.375”x32.5” Pipe 3X4GV-D 20 pc 1.375”x39.75” Swage Pipe 3X6-1GV-E 2 pc 1”x42” Rafter Brace Pipe w/Swage 3X6-1GV-F 2 pc 1”x42” Rafter Brace Pipe 3W2GV-R 2 pc 3-way Connectors - Right Side...
ROOF FRAME ASSEMBLY Step A Separate all pieces for the roof section first according to size and shape. Arrange per the illustration below. Right Corner Left Corner 3-Way 3-Way Centre Right Corner Left Corner 3-Way 3-Way...
Page 5
ROOF FRAME ASSEMBLY Step B Starting with the center section connect all “C” and “D” pipe together and to their corresponding 3 & 4 way connectors. Slide the short piece of the Woven Steel Cable over one end of each 3 & 4 way connector (The cable should hang loosely until the second section is installed) Align the predrilled holes so that the bolts can easily fit through.
COVER ASSEMBLY Drape the cover over the the roof frame with the grommets on the bottom facing the roof frame. Be sure to line up the corners and centre peak so that the cover fits nice and centre before attaching the ball bungees or legs.
LEG ASSEMBLY Step A First connect pipes “A” & “A” and bolt them together with a 5/16” x 2 1/2” bolt. Place them next to each 3 & 4 way connector. Pick up one side of the unit by the bottom portion of the 4 way fitting. Lift one side and insert the connected (“A”...
Page 8
END WALL ASSEMBLY Now that the frame and cover are completely asembled it’s time to attach the two end walls. A: Attach each end wall ring to the grommets on the end wall. (Four on each end wall). B: Next, loosen one side of the support bar on each end (“E” & “F”). Slide the rings on the support bar (coloured side on end wall facing out).
Page 9
ANCHORING YOUR UNIT This canopy is designed for use as a temporary structure. After assembly, the canopy MUST BE securely anchored to the ground to prevent damage from winds. Your canopy will act like a kite in the wind if not properly and securely anchored to the ground.
Page 10
IMPORTANT NOTICE: PLEASE READ CAREFULLY We are confident that you will be completely satisfied with your King Canopy unit. Please take a moment to read the very important information below, and call us with any questions you may have. King Canopy/PIC America, LTD. has no control over wind, snow, ice, rain or any other weather condition and we are in no way responsible for any damage caused by the canopy or to the canopy.
We try our best to eliminate any defective parts that are shipped with our products. Carefully inspect all packages upon arrival and report any missing or defective items upon receipt. Any discrepancies must be reported to King Canopy within 30 days of purchase. Please be sure to take a few minutes to match all items in the box to the items on the product manual.
Need help?
Do you have a question about the StorGuardII SG1324S-GV and is the answer not in the manual?
Questions and answers