Introduction; System Introduction - Alpha ESS Storion-SMILE T10 Installation Manual

Outdoor energy storage system
Table of Contents

Advertisement

INTRODUCTION

01
INTRODUCTION

1.1 System Introduction

AlphaESS Storion-SMILE-T10 (incl. M4856-S, HV50056 and SMILE-T10-INV) can be
applied in DC-coupled systems (mostly new installation), AC-coupled systems (mostly
retrofit) and Hybrid-coupled systems (mostly retrofit, and PV capacity-increase), as the
following scheme:
PV
LAN
Monitoring
Alpha
Device
Cloud
Storion-SMILE-T10
Figure 1 DC-coupled Storage System – Scheme
PV
PV Inverter
Grid Meter
LAN
Monitoring
Alpha
Device
Cloud
Storion-SMILE-T10
Figure 2 AC-coupled Storage System – Scheme
01
01
Grid Meter
Grid
Normal Loads
Critical Loads
Grid Meter
Grid
Normal Loads
Critical Loads
02
02
PV
PV Inverter
Grid Meter
PV
LAN
Monitoring
Alpha
Device
Cloud
Storion-SMILE-T10
Figure 3 Hybrid-coupled Storage System – Scheme
CAUTION:
For the AC-/ Hybrid-coupled system, unlike DC, two power meters are to be mounted.
In Germany some federal states require that only AC solutions be used if more than 10 kWp
capacity of PV is installed, the meters of grid company must be also installed in the system as
the following figure shows
Grid Meter
PV
PV Inverter
Z2 of Grid
Company
LAN
Monitoring
Alpha
Device
Cloud
Storion-SMILE-T10
Figure 4 AC-coupled Storage System – Scheme, Germany >10 kWp
INTRODUCTION
Grid Meter
Grid
Normal Loads
Critical Loads
Z1 of Grid
Grid Meter
Grid
Company
Normal Loads
Critical Loads

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-t10-invHv50056M4856-s

Table of Contents