Alpha ESS Storion-SMILE T10 Installation Manual page 13

Outdoor energy storage system
Table of Contents

Advertisement

INSTALLATION
Step 6 Connect the PV MC4 connector to the PV ports of the inverter.
AU
DE
Figure 31 Connection of AC cables
Remove the AC cable terminal strip cover, crimp the AC cable and connect it to the
Step 7
corresponding terminal block position, and then fix back the cover, as shown in Figure 30.
Grounding position of inverter
Figure 32 Earthing Point
As shown in Figure 30, the grounding position of the HV50056 and the inverter.
Step 8
21
On-Grid (L1/L2/L3/N/PE)
Back-Up (L1/L2/L3/N)
On-Grid (L1/L2/L3/N/PE)
Back-Up (L1/L2/L3/N/PE)
Grounding position of HV50056
22
Figure 33 DIP Switch Definition
DIP switch defines the ID address of each battery in one cluster. Set the DIP switch of the
Step 9
nearest battery from the HV50056 to the farthest battery in sequence of 1 to N. N is the number of
the batteries, which is min. 4 and max. 8.
NOTE: There should be no same ID number in one cluster.
Figure 34 Turning on the Switch
INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-t10-invHv50056M4856-s

Table of Contents