Assembling Of The Front Panels; System Registration - Alpha ESS Storion-SMILE T10 Installation Manual

Outdoor energy storage system
Table of Contents

Advertisement

EMS INTRODUCTION AND SET UP
In an AC/Hybrid mode, the Meter 2 status shows YES, which means normal. In a DC
mode, the Meter 2 status shows YES, which means normal. Then EMS can work
normally.

4.4 Assembling of the Front Panels

Figure 68 Assembling of the Front Panels
Step 1 Inverter part: please unscwer the scwews of Bracket A and hang the front
panel of the inverter onto Bracket B. Fix the front panel to Bracket B with scwews.
Battery and control box: Push the top two guide rods into the housing and press
the buckle from the bottom right in the middle.
Note: please assemble the front panel of the inverter at first, then HV50056 and the
batteries.
37
38
05

SYSTEM REGISTRATION

Installers who haven't yet registered need to click "Register" to visit the registration
page. Please refer to "AlphaCloud Online Monitoring Webserver Installers User Manual",
which you can get from AlphaESS sales and get license number from relevant sales from
Alpha ESS
SYSTEM REGISTRATION
Log in to your installer account and
choose Storage System Maintenance>
"Install new system" to register new
system at Alpha ESS.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-t10-invHv50056M4856-s

Table of Contents