Avaya Communication Server 1000M Series Upgrade page 93

Meridian 1 51c sg cp piv upgrade
Table of Contents

Advertisement

Upgrade Core 0 hardware
Table 14
Core module ID switch settings (System Utility card)
Core 0
Core 1
Procedure 19
Checking main Core card installation
The main Core cards (including the cables for power and data), are installed
in the factory as shown in Figure 21 on
1
NT4N65AC CP Core Network Interface (cCNI) cards:
Each system contains one NT4N65 cCNI card per Core/Net module. The
cCNI cards are located in slot c9. If not already installed, install a
P0605337 CP Card Slot Filler Panel to cover slots c10 - c12, which do not
contain cCNIs.
Note: In the NT4N41 Core/Net
Network Interface (cCNI) Card can only be configured as "group 0." The
cCNI and 3PE cards for group 0 communicate through the NT4N29 cable.
Only one cCNI card is required for group 0 in a Meridian 1 Option 61C CP
PIV.
2
Slots c13 and c14 are left empty. If not already installed, install a
P0605337 CP Card Slot Filler Panel in each slot.
3
NT4N48 System Utility (Sys Util) card is located in slot c15.
a.
Check side ID switch settings for the SU card in Core/Net 1 according
to Table 14.
Position 1
On
Off
4
The NT4N39 CP PIV is located in the Call Processor slot.
5
The N0026096 blank faceplate is located in the extreme right-hand slot
next to the CP PIV card. Check that the NT4N4405 shelf power cable is
installed in the CP card cage backplane. See Figure 22 on
cable location.
Performing the upgrade
page
94.
module,
port 0 on the NT4N65 Core to
Position 2
On
On
51C to CS 1000M SG CP PIV Upgrade
Page 93 of 198
page 95
for the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1000m seriesCs 1000m sgCs 1000m mg

Table of Contents