RGBlink X14 User Manual page 5

Hide thumbs Also See for X14:
Table of Contents

Advertisement

The AC Socket-outlet should be installed near the equipment and be easily accessible.
Unpacking and Inspection
Before opening X14 processor shipping box, inspect it for damage. If you find any damage, notify the
shipping carrier immediately for all claims adjustments. As you open the box, compare its contents
against the packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during shipping. If
there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your X14should be clean, properly lit, free from static, and have
adequate power, ventilation, and space for all components.
X14
User Manual
4

Advertisement

Table of Contents
loading

Table of Contents