Original installation and operating instructions Fault finding the product These installation and operating instructions Technical data describe Grundfos SEG pumps. 10.1 Operating conditions Sections 1-5 give the information necessary to be 10.2 Electrical data able to unpack, install and start up the product in a 10.3 Dimensions and weights...
1.1 Hazard statements intended for professional installers. The symbols and hazard statements below may 2. Receiving the product appear in Grundfos installation and operating instructions, safety instructions and service The pump may be transported and stored in a instructions. vertical or horizontal position. Make sure that the pump cannot roll or fall over.
3. Installing the product 3.1 Mechanical installation Pump installation in pits must be carried Make sure the pit bottom is even before out by specially trained persons. installing the product. Work in or near pits must be carried out according to local regulations. DANGER Electric shock Persons must not enter the installation...
Page 5
Crushing of hands operate continuously (S1). Death or serious personal injury - When lifting the pump, make sure your Always use Grundfos accessories to avoid hand is not caught between the lifting malfunctions due to incorrect installation. bracket and the hook.
Page 6
3.1.2 Installation on auto coupling 6. Clean out debris from the pit before lowering the pump into the pit. Pumps for permanent installation can be mounted on a stationary auto-coupling guide rail system or a 7. Fit the guide claw to the pump outlet. Grease the hookup auto-coupling system.
Page 7
Hookup auto-coupling system 3.1.3 Free-standing submerged installation See fig. in Appendix. Pumps for free-standing submerged installation can stand freely on the bottom of the pit or similar Proceed as follows: location. See fig. in Appendix. 1. Fit a crossbar in the pit. The pump must be mounted on separate feet 2.
They must be with IEC trip class 10. connected to the Grundfos LC, LCD 108 pump controller via the intrinsically safe LC-Ex4 barrier to ensure a safe circuit. The permanent installation must be fitted with an earth-leakage circuit breaker.
Page 9
Fig. 2 Wiring diagram for single-phase pumps breaker, such as a Grundfos CU 100 • a Grundfos LC, LCD 107, LC, LCD 108 or LC, LCD 110 pump controller. See fig. and the installation and operating instructions for the selected control unit or pump controller.
4. Starting up the product DANGER Electric shock CAUTION Death or serious personal injury Crushing of hands - Before starting up the product for the Minor or moderate personal injury first time, check the power cable for - Do not put your hands or any tool into visible defects to avoid short circuits.
4.1 Operating modes S1, continuous operation In this operating mode, the pump can operate continuously without being stopped for cooling. Do not start the pump if the atmosphere in Being completely submerged, the pump is the pit is potentially explosive. sufficiently cooled by the surrounding liquid.
4.3 Direction of rotation The pump may be started for a very short period without being submerged to check the direction of rotation. All single-phase pumps are factory-wired for the correct direction of rotation. Before starting up three-phase pumps, check the direction of rotation.
6. Product introduction Proceed as follows: 1. Remove the fuses, and check that the impeller 6.1 Product description can rotate freely. Turn the grinder head by hand. 2. Check the condition of the oil in the oil chamber. See also section 8.4 Oil check and oil change.
6.2 Applications The letter X in the certificate number The compact design makes the pumps suitable for indicates that the equipment is subject to both temporary and permanent installation. special conditions for safe use. The conditions are mentioned in the certificate The pumps can be installed on an auto-coupling and in these installation and operating system or stand freely on the bottom of the pit.
6.5 Approvals The standard version of SEG pumps has been tested by VDE The explosion-proof version of SEG has been approved by DEKRA according to the ATEX directive. 6.5.1 Approval standards The standard version of SEG pumps has been approved by Tüv Rheinland LGA according to EN 12050-1.
Fix the extra nameplate supplied with the pump at Example: SEG.40.12.Ex.2.1.502 the installation site or keep it in the cover of this booklet. Code Description Designation Grundfos sewage Type range pumps Type: Grinder system in the Model: Impeller type pump inlet...
7. Protection and control functions The pump must not run dry. The liquid level can be controlled via the Grundfos Install an additional level switch to ensure LC, LCD 107, LC, LCD 108, LC, CLD 110 level that the pump is stopped in case the stop controllers, and the pumps can be protected via level switch is not operating.
7.3 CU 100 control unit 7.4.2 Recommendations Before installing a frequency converter, calculate the CU 100 incorporates a motor-protective circuit lowest allowable frequency in the installation in order breaker and is available with level switch and cable. to avoid zero flow. Single-phase pumps •...
8. Servicing and maintaining the DANGER product Crushing hazard Death or serious personal injury 8.1 Safety instructions and requirements - Make sure that the hook is fixed properly to the lifting bracket. DANGER - Always lift the pump by its lifting bracket Electric shock or by means of a forklift truck if the pump is fixed on a pallet.
Make sure that the cable entry is watertight and that the cables are not A possible replacement of the power cable sharply bent and/or pinched. must be carried out by Grundfos or a service workshop authorised by Grundfos. • Pump parts Check the impeller, the pump housing, etc.
8.4 Oil check and oil change Oil filling Every 3000 operating hours or at least once a year, change the oil in the oil chamber as described below. Oil level If the shaft seal has been changed, change the oil as well.
8.6 Replacing the grinder system Assembly 1. When fitting the grinder head (45), the CAUTION projections on the back of the grinder head must engage with the holes in the impeller (49). Sharp element 2. Tighten the screw (188a) for the grinder head to Minor or moderate personal injury 20 Nm.
The bush must be intact. If the bush is worn and must be replaced, the pump must be checked by Grundfos or a service workshop authorised by Grundfos. If the bush is intact, proceed as follows: 1.
8.9 Service kits The following service kits are available for all pumps. Service kit Contents Pump type Material Product number SEG.40 96076122 09-15 SEG.50 96076123 Shaft seal kit Shaft seal complete SEG.40 96645160 26-40 SEG.50 96645275 Shaft seal Shaft seal carrier SEG.50 99346051 carrier...
9. Fault finding the product Before attempting to diagnose any fault, read and Before attempting to diagnose any fault, observe the safety instructions in section 8.1 Safety - make sure that the fuses have been instructions and requirements. removed or the main switch has been Observe all regulations applying to pumps switched off installed in potentially explosive...
10. Technical data 10.2.4 Winding resistances Motor size Single-phase motor 10.1 Operating conditions The Grundfos SEG pumps are designed for [kW] Starting winding Main winding intermittent operation (S3). When completely 4.5 Ω 2.75 Ω 0.9 - 1.2 submerged in the pumped liquid, the pumps can also operate continuously (S1).
1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. The crossed-out wheelie bin symbol on a product means that it must be disposed of separately from household waste.
Page 28
Appendix One-pump installation on auto coupling Z10a ZDN1 Fig. 1 SEG.40 Power ZDN1 Z10a Z12a S3OPR [kW] 0.9 and 1.2 Rp 1 1/2 3/4"-1" 1.5 (3 phase) Rp 1 1/2 3/4"-1" 1.5 (1 phase) Rp 1 1/2 3/4"-1" Rp 1 1/2 3.1 and 4.0 Rp 1 1/2 SEG.50...
Page 29
One-pump installation on hookup auto coupling Fig. 2 SEG.40 Power ZDN1 Z12a [kW] 0.9 and 1.2 Rp 1 1/2 1.5 (3 phase) Rp 1 1/2 min. 1.5 (1 phase) Rp 1 1/2 Rp 1 1/2 3.1 and 4.0 Rp 1 1/2 SEG.50 Power ZDN1...
Page 30
Free-standing installation Fig. 3 SEG.40 Power [kW] 0.9 and 1.2 DN 40 1.5 (3 phase) DN 40 1.5 (1 phase) DN 40 DN 40 3.1 and 4.0 DN 40 SEG.50 Power [kW] 3.1 and 4.0...
Page 36
Opis Descrição Instalaţie fixă Naziv Pos. Kołek Pino Klin Rebite Zakovica Klin Chaveta Cheie Klin Pierścień O-ring O-rings Inel tip O O-prsten Pierścień tnący Anilha da trituradora Inel tocător Prsten seckalice Głowica tnąca Cabeça da trituradora Cap tocător Glava seckalice Stator Estator Stator...
Page 37
مية التس Beskrivning Opis Popis Tanım Pos. Stift Zatič Kolík مس مار مح ور Zakovica Nýt Perçin مس مار برش ام Ključ Pero Anahtar مفت اح O-ringar O-obroči O-krúžky O-ringler حلق ات من ع تس رب Skärring Drobilni obroč Rezacie koleso Parçalayıcı...
Page 38
Argentina China Hong Kong Bombas GRUNDFOS de Argentina S.A. GRUNDFOS Pumps (Shanghai) Co. Ltd. GRUNDFOS Pumps (Hong Kong) Ltd. Ruta Panamericana km. 37.500 Centro 10F The Hub, No. 33 Suhong Road Unit 1, Ground floor Industrial Garin Minhang District Siu Wai Industrial Centre 1619 Garín Pcia.
Page 39
Malaysia Serbia Turkey GRUNDFOS Pumps Sdn. Bhd. Grundfos Srbija d.o.o. GRUNDFOS POMPA San. ve Tic. Ltd. 7 Jalan Peguam U1/25 Omladinskih brigada 90b Sti. Glenmarie Industrial Park 11070 Novi Beograd Gebze Organize Sanayi Bölgesi 40150 Shah Alam Phone: +381 11 2258 740...