Download Print this page
Enwork Stealth Installation Manual

Enwork Stealth Installation Manual

Two base conference table
Hide thumbs Also See for Stealth:

Advertisement

Quick Links

S T E A L T H
T W O
B A S E
I N S T A L L A T O I N
G U I D E
C O N F E R E N C E
T A B L E
T I 0 0 0 9
Stealth Two Base Installation Guide – Rev B.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Stealth and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Enwork Stealth

  • Page 1 I N S T A L L A T O I N G U I D E C O N F E R E N C E T A B L E T I 0 0 0 9 Stealth Two Base Installation Guide – Rev B.
  • Page 2: Installation

    I N S T A L L A T I O N G U I D E P A R T S A N D F A S T E N E R S I N C L U D E D Beam #10 x 1”...
  • Page 3 I N S T A L L A T I O N G U I D E T O O L S A N D S U P P L I E S R E Q U I R E D Powerdrill #2 Square Bit ⁄...
  • Page 4 I N S T A L L A T I O N G U I D E A S S E M B L Y : Slide the LYTS’ s equidistant onto the beams. Depending on the size of the table each Beam may get 1-3 LYTS’...
  • Page 5 I N S T A L L A T I O N G U I D E A S S E M B L Y : Once the LY.ENDLEG’ s are installed the Beams can be slotted onto the LY.MTP’ s on the LY.ENDLEG’ s . The LY.MTP should fit neatly into the slot on the beams as shown in Figure 4.
  • Page 6 1.800.815.7251 www.enwork.com 12900 Christopher Dr. Lowell, MI 49331 Specifications subject to change without notice. Rev 02.2020...