Enwork SKYLINE Installation Manual

Freestanding topper screens

Advertisement

S K Y L I N E
S C R E E N S
TI0050 - Skyline Freestanding Installation Guide - Rev A.
F R E E S T A N D I N G
I N S T A L L A T I O N
S C R E E N S
T O P P E R
G U I D E
WARNING:
Acrylic screens scratch and scuff easily. After removing
protective film, immediately and carefully install the screen.
DO NOT remove protective film from acrylic screens, then stack
them in a pile or against each other. Experience shows this will
cause marring and scratching. 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SKYLINE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Enwork SKYLINE

  • Page 1 DO NOT remove protective film from acrylic screens, then stack them in a pile or against each other. Experience shows this will TI0050 - Skyline Freestanding Installation Guide - Rev A. cause marring and scratching. ...
  • Page 2 I N S T A L L A T I O N G U I D E P A R T S A N D F A S T E N E R S I N C L U D E D Screen Panel Tape PNM-1947 BRACKET...
  • Page 3 I N S T A L L A T I O N G U I D E A S S E M B L Y : Sandwich the Acrylic or Acoustic Panel Screen between the Brackets, aligning the holes in the screen and the bracket. Attach them all together with the Binding Bolt pair.
  • Page 4 1.800.815.7251 www.enwork.com 12900 Christopher Dr. Lowell, MI 49331 Specifications subject to change without notice. Rev 06.2020...

Table of Contents