oventrop Regumaq X-25 Operating Instructions Manual page 65

Fresh water station
Hide thumbs Also See for Regumaq X-25:
Table of Contents

Advertisement

Instruction/Handover
The installer has informed the user about the maintenance work that has been completed.
The installer has informed the user about potential modifications and repair work.
The installer has provided the user with the necessary documents.
Information on correct operation of potable water systems:
- Stagnation must be avoided; a regular exchange of the potable water must be ensured
- TPWH must be maintained at >= 60 °C at the hot water outlet
- The circulation system must be designed in such a way that the potable water temperature does not fall more
than 5 K
- below the station outlet temperature of >= 60 °C
- TPWC must be maintained at < 25 °C at the cold water outlet
Installer / Installation company
_____________________________________________________________
Date / Signature / Stamp
User
Maintenance report received
_____________________________________________________________
Date / Signature
¨
¨
¨

Advertisement

Table of Contents
loading

Table of Contents