oventrop Regumaq X-25 Operating Instructions Manual page 4

Fresh water station
Hide thumbs Also See for Regumaq X-25:
Table of Contents

Advertisement

Contents
4.5
Aquastrom R .......................................................................................................................... 21
4.6
Strainer ................................................................................................................................... 21
4.7
Water filter Aquanova Magnum .............................................................................................. 21
4.8
Grounding clip ........................................................................................................................ 21
4.9
Connection fittings ................................................................................................................. 21
5.
Transport and storage.......................................................................................................... 22
6.
Installation ............................................................................................................................. 22
6.1
Advice regarding installation .................................................................................................. 22
6.2
Wall attachment of the station................................................................................................ 23
6.2.1
Required tools ....................................................................................................................................... 23
6.2.2
Installation ............................................................................................................................................. 23
6.3
Pipework ................................................................................................................................ 25
6.4
Protective equipotential bonding/Grounding ......................................................................... 27
7.
Commissioning ..................................................................................................................... 28
7.1
Filling and bleeding of the storage cylinder circuit ................................................................. 28
7.2
Filling and bleeding of the potable water circuit .................................................................... 29
7.3
Electrical connection .............................................................................................................. 29
7.3.1
Power supply via pre-assembled power supply cable ......................................................................... 30
7.3.2
Power supply without pre-assembled power supply cable .................................................................. 30
7.4
Configuration of the circulation function (optional) ................................................................ 32
7.4.1
Activation of the circulation function ..................................................................................................... 32
7.4.2
Operating mode of the circulation pump .............................................................................................. 32
7.5
Handover to the user .............................................................................................................. 33
8.
Operation .............................................................................................................................. 34
8.1
Setting of the nominal hot water temperature ........................................................................ 34
8.2
Emergency operation (manual operation) .............................................................................. 34
8.3
Anti-lock protection ................................................................................................................ 35
8.4
Displays .................................................................................................................................. 35
8.4.1
Error messages on the display .............................................................................................................. 35
8.4.2
Control LED ........................................................................................................................................... 35
8.5
Replacement of the fuse ........................................................................................................ 35
9.
Troubleshooting .................................................................................................................... 37
9.1
Troubleshooting table ............................................................................................................. 37
9.2
Nominal resistances of the temperature sensors ................................................................... 38
9.3
Decalcification of the heat exchanger .................................................................................... 39
9.3.1
Decalcification of the potable water side after installation ................................................................... 39
9.3.2
Cleaning of the heat exchanger (storage cylinder circuit side) ............................................................. 40
9.3.3
Decalcification of the dismounted heat exchanger ............................................................................... 41
9.4
Cleaning of the flow sensor .................................................................................................... 42
9.4.1
Required tools ....................................................................................................................................... 42
9.4.2
Cleaning of the measuring turbine ........................................................................................................ 42
4
"Regumaq X-25"
138112581-V01.10.2019

Advertisement

Table of Contents
loading

Table of Contents