oventrop Regumaq X-25 Operating Instructions Manual page 64

Fresh water station
Hide thumbs Also See for Regumaq X-25:
Table of Contents

Advertisement

If there are any steps you do not
complete or if you respond with 'No',
please explain in the comments field!
7
Was a functional check carried out
to review performance (see op-
erating instructions for functional
check)?
8
Were all ball valves checked for
ease of movement?
9
If there were any strainers installed
on site, have they been cleaned?
10
Are all isolating valves open?
11
Was the storage cylinder side bled
and were the bleeders checked for
opening and functionality?
12
Were the controller values com-
pared with the details in the hando-
ver report (document any deviations
in the comments)?
Maintenance work
1
Which potable water temperature
was entered?
2
Was circulation activated?
2.1 Which mode was activated?
3
Is the controller LED lit up green?
4
Have additional changes been
made to the controller settings?
Repair work (only complete in the event of repairs or component replacements)
1
Which component was replaced?
1.1 Reason for replacement
2
Which component was replaced?
2.1 Reason for replacement
3
Which component was replaced?
3.1 Reason for replacement
4
Was commissioning carried out
in accordance with the operating
instructions after having completed
the repair work?
Tick as appropriate or
enter a value/number
Yes
No
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
¨
°C
¨
¨
¨
¨
¨
¨
¨
¨
Comments/settings

Advertisement

Table of Contents
loading

Table of Contents