oventrop Regumaq X-25 Operating Instructions Manual page 31

Fresh water station
Hide thumbs Also See for Regumaq X-25:
Table of Contents

Advertisement

"Regumaq X-25"
Illust. 23: Installation position
(1)
Opening for operation position
(2)
Opening for installation position
Illust. 24: Opening the controller
(1)
Connection panel cover
(2)
Torx screw
(3)
Supply pipe cover
138112581-V01.10.2019
3. Remove the screw (see position (2) in Illust. 24) and
put it to one side.
4. Slide the connection panel cover (see position (1) in
Illust. 24) upwards until it audibly locks into place.
5. Fold down the supply pipe cover (see position (3) in
Illust. 24).
6. Guide the power line through the designated open-
ing in the cover.
7. Establish the electrical connections according to
the terminal allocation (see Illust. 7 on page 19).
8. Secure the power line in place with a suitable cable
tie to relieve tension.
9. Close the supply pipe cover and connection panel
cover.
10. Tighten the screw.
1
11. Put the controller back from the installation position
2
to the operating position (see Illust. 22 on page
30).
12. Lay the electrical lines in the designated channels in
the lower shell.
1
2
3
Illust. 25: Cable channels of the lower shell
(1)
Channel for sensor and control lines
(2)
Channel for 230V line
13. Connect the power supply.
 The station is ready for operation.
Commissioning
1
2
31

Advertisement

Table of Contents
loading

Table of Contents