Shutdown - REMKO KWK Series Operating And Installation Instructions

Cold water wall and ceiling units
Table of Contents

Advertisement

REMKO KWK series (DM)
Final tasks
n
Mount all removed parts.
n
Familiarise the operator with the system.
28
10

Shutdown

Temporary shutdown
1.
Let the unit run for 2 to 3 hours in circulation
mode, or in cooling mode at maximum tem-
perature, to extract any residual humidity
from the unit.
2.
Put the system out of operation using the
controller.
3.
Switch off the power supply to the unit.
4.
Check the unit for visible signs of damage
and clean it as described in the "Care and
maintenance" chapter.
Permanent shutdown
Ensure that units and components are disposed of
in accordance with local regulations, e.g. through
authorised disposal and recycling specialists or at
collection points.
REMKO GmbH & Co. KG or your contractual
partner will be pleased to provide a list of certified
firms in your area.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kwk dm seriesKwk 175 ec dmKwk 225 ecKwk 225 ec dmKwk 135 ec dmKwk 135 ec ... Show all

Table of Contents