Machine Specifications:
Drill Type
Max. Drill Capacity
Spindle Taper
Spindle Travel
Max. Work Diameter
Speeds (Step Pulley)
Spindle Speed Range
Column Diameter
Table
Base
Spindle to Table
Spindle to Base
Motor
Voltage
Overall Height
Weight
Uncrating and installation
1.
Location of the drill press should be in a well-lit area with correct power supply.
2.
Carefully uncrate machine from crate. Inspect all packing as not to throw out
any parts or manuals.
3.
When transporting the machine please use caution. If using a sling have
someone steady the machine while transporting it.
4.
Install your drill press on a sturdy level floor surface. The machine must be
anchored to the floor. Machine is top heavy.
5.
Connect appropriate power to the machine (see electrical diagram last page of
manual). Make sure circuit breakers are suitable for the machine. Consult local
codes for proper installation of machine. Always route power cables in a safe
manner away from traffic areas, damp areas, heat and moving parts.
6.
After installing the drill press, use a degreasing product to clean off the anti-rust
oil which was applied at the factory. Then wipe machined surfaces with a light
coating of lubricant oil. (Way oil)
7.
Check for damaged parts. Before further use of the machine, a guard or other part that
is damaged should be replaced or repaired. Carefully check to determine that it will operate
properly and perform its intended function. Check for alignment of moving parts, binding of
MODEL AND SPECIFICATIONS
2
Model SB-25
Floor
1"
MT3
5"
18"
9
270-2000
3-5/8"
14 x 14"
23-1/2 x 15"
28-1/4"
49-1/8"
2 HP
110V
71"
422 lbs.