GLP Fusion Stick FS20 Quick Start And Safety Manual page 22

Table of Contents

Advertisement

www.glp.de
To install a second fixture on top of
the first fixture, see Figure 15. Have
two Locking Pins ready to fasten
the fixtures together.
Lower the second fixture onto the
first fixture oriented so that the
locking channels in both fixtures
mesh correctly. Then press the
buttons on the Locking Pins and
press them fully into the locking
channels before releasing the
buttons.
Check that both Locking Pins are
locked into position and that the
fixtures are fastened securely
together.
Make sure that it is impossible for the two fixtures to fall or be knocked over. If the
arrangement is not completely safe, secure it with a safety cable or reinstall the
fixtures using a larger F34 truss base plate.
22
Figure 15. Locking pins ready for second
fixture standing vertically
Fusion Stick FS20
Quick Start and Safety Manual Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents