Huawei FusionModule1000A20 Installation Manual page 93

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Materials: cable tie and rubber washer
Documents: none
Skill requirement: skilled technician
Procedure
Step 1 (Optional) Install a rubber pad in the position where external mains or diesel generator power
cables will be mounted on a cable tray.
Step 2 Carry the cables routed into a plastic coated metal hose onto the cable tray, and bind them
with cable ties.
Step 3 Cut the cable ties and adjust the cables.
The cable adjustment requirements are as follows:
Step 4 After adjusting cables as required, bind them with cable ties.
Issue 02 (2020-01-15)
A rubber pad is installed in the mounting position to prevent cable tray burrs from scraping cable
sheathings.
The cables are long. Assign sufficient people and ladders to carry the cables onto the cable
tray.
Before mounting cables on the cable tray, understand the installation precautions and the
regulations for working at heights, and put on necessary protective equipment such as
safety helmets and gloves.
After mounting cables on the cable tray, lay out the cables horizontally without twists and
bind the cables in proper positions with cable ties.
Reserve sufficient cable length and bending space when turning an armored power cable.
If possible, place armored cables and thick cables on the outside and lower layer of the
cable tray.
The cable bend radius must meet requirements.
Fire control cables and monitoring cables must be placed in the inside on the upper layer
of cable trays.
Armored cables and power cables must be placed in the outside and bottom layer of cable
trays.
Cables must be level, without unevenness and deflection.
Copyright © Huawei Technologies Co., Ltd.
A A Basic Installation Operations
87

Advertisement

Table of Contents
loading

Table of Contents