FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Categor
y
ables
Issue 02 (2020-01-15)
Tools and Materials
ESD gloves
Safety belt
ESD wrist strap
Scissors
This table may not list some tools required at specific sites. Onsite installation personnel and
technical support personnel should prepare tools based on site requirements.
Some dedicated tools and installation materials provided with the equipment may not be listed in
this table.
Copyright © Huawei Technologies Co., Ltd.
Protective gloves
Safety goggles
Rubber gloves
N/A
3 Installation Preparations
Safety helmet
Anti-skid shoes
Heat shrink tubing
(diameter 20 mm-radial
shrinkage rate 50%-
operating temperature
range
55 ° C-105 ° C-length 10
mm)
N/A
10