Note
The actual intervals at which maintenance procedures are to be performed depend on the
environmental and operating conditions. Define maintenance intervals that reflect your plant-
specific environmental and operating conditions and meet your availability requirements. When
doing so, take the prescribed maintenance intervals into consideration, as well as the
instructions for repairing and replacing installed components.
See also
Visual inspections (Page 78)
Note
Siemens offers its customers support in the form of a service contract. For further details,
contact your regional office or sales office.
Note
Inform the manufacturer about each maintenance job that has been carried out and about each
spare part replacement for the purposes of a reliability analysis.
9.2

Opening the device

The door of the closed-loop control cabinet is not electromechanically interlocked. For this
reason, it can also be opened during operation.
Using a switch at the control cabinet, you can release the electromagnetic door interlocking for
air-cooled power units. The electromechanical door interlock system is designed to protect
personnel and is an integral part of the safety concept. During operation and when the circuit
breaker is closed, all the doors are interlocked (with the exception of the door for the control
section).
The conditions to enable the door release can be found using parameter r6586 (VECTOR). The
parameter indicates the actual status. For further information, please refer to the List Manual.
9.3

Preventive maintenance

The purpose of an inspection is to ascertain and evaluate the current status of the equipment.
An inspection mainly comprises visual checks. Inspections should be carried out based on a
schedule that meets the needs of the special ambient conditions at the location of use. The
following servicing and inspection instructions are used as the basis for regular inspection of
the equipment.