Requirements Placed On The Levelness Of The Floor; Inspections When Receiving The Delivery; Checking Shock And Tilt Indicators - Siemens SINAMICS SL150 6SL39616RC100AA02 Operating Instructions & Installation Instructions

Medium-voltage
Table of Contents

Advertisement

Preparations for use

4.3 Inspections when receiving the delivery

For information about permissible ambient and installation conditions, see the "Technical data
and drawings" section.
4.2.2

Requirements placed on the levelness of the floor

Ensure that the following requirements are satisfied:
● The floor is completely horizontal and flat.
● The doors can be opened and closed. The locking systems function correctly.
● Flat parts and components, e.g. doors and side panels, seal correctly. Only then is the
4.3
Inspections when receiving the delivery
4.3.1

Checking shock and tilt indicators

The purpose of shock and tilt indicators
The unit is equipped with shock and tilt indicators to monitor for damage during transit. It is
essential that you check the shock and tilt indicators before commissioning the unit.
Tripped shock and tilt indicators
Safe operation of the device is not guaranteed if the shock or tilt indicator has tripped
(responded)
This can result in death, serious injury or material damage.
● If one of the indicators has tripped, do not perform any commissioning.
● Inform the Technical Support. Only specialist Siemens technicians can recommend
See also
Service & Support (Page 89)
42
degree of protection maintained.
WARNING
appropriate measures.
SINAMICS SL150 6SL39616RC100AA02
Operating Instructions Rev.201910281458 EXAMPLE

Advertisement

Table of Contents
loading

Table of Contents