Creating A Project; Transfer Inverters Connected Via Usb Into The Project - Siemens SIMATIC ET 200pro FC-2 Operating Instructions Manual

Low voltage converter for the distributed i/o system
Hide thumbs Also See for SIMATIC ET 200pro FC-2:
Table of Contents

Advertisement

Preconditions for basic commissioning
You require the following to commission the inverter using STARTER:
● An installed drive (motor and inverter)
● A computer with Windows XP or Windows 7
● The installed STARTER V4.3 or higher.
Updates for STARTER are available from the following link:
(http://support.automation.siemens.com/WW/view/en/10804985/133100)
● An appropriate USB cable.
6.6.2.1

Creating a project

Creating a new project
Procedure
1. Start the commissioning software.
2. In the menu, select "Project" → "New...".
3. Specify a name of your choice for the project.
You have created a new project.
6.6.2.2

Transfer inverters connected via USB into the project

Integrating the inverter into the project
Procedure
1. Switch on the inverter supply voltage.
2. First insert a USB cable into your PC and then into the inverter.
3. The PC operating system installs the USB driver when you are connecting the inverter
and PC together for the first time.
4. Press the "Accessible nodes" button.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257324B AF
STARTER download
Commissioning
6.6 Quick commissioning
83

Advertisement

Table of Contents
loading

Table of Contents