Siemens SIPROCESS GA700 Compact Operating Instructions page 29

Continuous gas analysis, devices in explosion-proof design
Hide thumbs Also See for SIPROCESS GA700:
Table of Contents

Advertisement

Figure 4-3
Procedure
1. Drill four holes into the wall.
The dimensions for the drill holes are specified in the drilling pattern.
2. Insert the anchors in the drilled holes.
3. Position the wall-mounted device on the wall and fasten it with the screws.
Devices in explosion-proof design
Compact Operating Instructions, 05/2018, A5E35134047-03
Dimensions with open wall-mounted device
Installing
4.5 Wall-mounted device
29

Advertisement

Table of Contents
loading

Table of Contents