Brief description of the detailed procedure
If you do not use the quick start procedure, commission the device with the steps described
below:
1. Call the main menu:
– Switch the measured-value display to selection mode.
– Press <Enter> again to open the main menu.
2. Identify the device: [3.09] Maintenance & Diagnostics > Identification
3. Specify the PIN for the user levels: [5.1] Security > Access management.
In the factory settings, the PIN 1111 is the default for the "Standard" user level and PIN
2222 for the "Expert" user level.
4. Disable automatic log-off temporarily:
The factory setting is a log-off time of 5 min. When this time elapses, changes that were
not stored retentively are lost. We recommend that you temporarily deactivate the
automatic log-off during commissioning.
5. Define measuring ranges:
[2.03] Settings > Measuring ranges
Note
Putting back into operation with disabled measuring ranges
The measuring ranges are activated in the factory. If you disable the measuring ranges
(setting: "Off"), all the setting options in other menus related to the measuring range are
also hidden. The measuring ranges can no longer be used.
If you put the device back into operation with fully deactivated measuring ranges, the
status bar of the display shows message 150 "Parameter value invalid".
Before you continue recommissioning, the following applies:
• Activate at least one measuring range.
• Disable the autoranging function if it is enabled.
6. Set inputs/outputs: [2.09] Inputs/outputs
– Set digital inputs: [2.09.3] Digital inputs.
– Setting digital outputs [2.09.5] Digital outputs
If you have the appropriate optional modules:
– Set analog inputs: [2.09.1] Setting analog inputs
– Set analog outputs: [2.09.2] Setting analog outputs
7. Check setting of gas path and change, if necessary:
[2.12] Settings > Gas path / process tag label
Devices in explosion-proof design
Compact Operating Instructions, 05/2018, A5E35134047-03
To do so, press <ENTER>.
Commissioning
6.6 Commissioning the device
65