Application with zones

The following assumes a commercial building with a ground floor and four upper
floors. On the ground floor is a retail outlet with a showroom. Each of the upper
floors has four offices, three laboratories, and one IT room (server, printer, fax etc.)
Access to the upper floors is via a staircase and service elevator. There are various
alternatives for dividing this commercial building into operating zones.
The commercial building is occupied by only one tenant. In this case, the building
can easily be divided into 5 room groups or "geographical zone (apartm.)".
Ground floor
Stairwell
All IT rooms
Floors 1 - 4
All offices
Floors 1 - 4
All labs
Floors 1 - 4
There are five tenants in the commercial building. Tenant 1 occupies the ground
floor, and tenants 2 to 5 each occupy one of the four upper floors. All tenants have
their own requirements for their offices and labs. From a technical perspective, this
requires the building to be divided into eleven "geographical zone (apartm.)" or
room groups.
11
2
10
2
9
2
8
2
1
KNX bus communications
Appendix
Geographical zone (apartm.)=1 (Room group 1)
Geographical zone (apartm.)=2 (Room group 2)
Geographical zone (apartm.)=3 (Room group 3)
Geographical zone (apartm.)=4 (Room group 4)
Geographical zone (apartm.)=5 (Room group 5)
3
5
2
4
5
2
4
5
2
4
5
2
4
1
3
7
6
5
4
3
11
7
2
3
2
8
4
1
For internal use only
CE1P3127en
2013-04-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents