6 CABLING
6.1 Cabling
6.1.1
Interface signals and cabling
Module silk
Symbol
V-
CAN-L
SHD
CAN-H
V+
Black (V-)
Cable
Blue (CAN-L)
Red (V+)
White (CAN-H)
Bare wire (Drain)
As shown in the diagram above, press and attach the PG terminals to the cable wires (See
Section 6.1.4, "Restrictions on Cable Lengths."). Insert the power supply lines, signal lines,
and drain into the corresponding holes of the connector, and firmly tighten with each terminal
screw (with a tightening torque of 5±1 kg·cm). After connecting the cable to the connector,
insert the connector into the D.Station module so that the direction of the connector matches
that of the module, and then tighten the connector fixing screw.
Signal
Name
Power supply line (GND)
Signal line (L side)
Shield (Drain)
Signal line (H side)
Power supply line (+24V)
Screw to fix cables
Connector
PG terminal
Connector fixing screw
Figure 6-1 Module Wiring