2
Installing the UPS
Scenario 1: Floor Installation
Secured Installation
1. Determine the mounting holes based on the
marking-off template, drill holes, and install
expansion sleeves.
Unit: mm
Wall
Mounting holes for L-
shaped brackets
4. Use the L-shaped brackets to secure the cabinet to the floor.
2. Adjust the anchor bolts and ensure that the
3. Remove the front and rear covers from the
Edge of
the
cabinet
rear
Rear
Front
2
anchor bolts touch the floor. Then level the
UPS.
UPS.